TB-250 Torch Booster

TB-250 Torch Booster supplies high pressure natural gas at a flow rate up to 250 scfh

(250,000 BTU) from a ¼ psi utility natural gas supply. TB-500 can supply high pressure

natural gas at a flow rate up to 500 scfh (500,000 BTU) from a ¼ psi utility natural

gas supply. With higher pressure utility supply pressure greater flow rates are possible.


A Torch Booster is easy to use...just turn it on and get all the gas you need. When

your torch is not lit the Torch Booster automatically goes into recirculation mode.

They are designed to be left running for short periods when torches are not being

used and do not require operator attention as torches are turned on and off.


TB-250 and TB-500 Torch Boosters elevate gas pressure as high as 45 psi although

higher pressures are possible by special order. Please call G-TEC if you require

pressure higher than 45 psi.


TB-500 Torch Boosters can be modified to boost pressure to 150 psi for HVOF applications. Click here for more information about Heavy Duty TB-500H Torch Boosters for High Velocity Oxy-Fuel thermal spray.


If your production cycle is around the clock, your work area temperature exceeds 90F,

or you are using gas at pressure higher than 45 psi you should consider the

TB-250C/TB-500C or TB-250H/TB-500H Systems that incorporate a compressor

cooling system. Click here for more information about Heavy Duty Torch

Boosters.


Both systems measure 28” W x 24” D x 20” T; TB-250 weighs 175 lbs. and TB-500

weighs 285 lbs. In North America electrical requirements are 208V, 60Hz, 30 amp

service; Worldwide 230V, 50Hz, 30 amp service. Gas supply should be between ¼ to

5 psi and delivered in a 1 1/2” pipe which connects directly to the Torch Booster.


TB-250 and TB-500 Torch Boosters are Certified by CSA International, CE Compliant

and are permitted in buildings that prohibit gases in cylinders, such as acetylene

and propane.


Typical applications for the TB-250 Torch Booster include up to 8 standard flame

cutting or brazing torches, up to 4 Messer ALFA torches, 3 Shrinkfast Model 975

Heat Tools or 2 Model 998 Heat Tools, NC Tool Forge with up to 8 burners or a

Belchfire Mono Torch.


Typical applications for the TB-500 Torch Booster include up to 12 standard flame

cutting or brazing torches, up to 10 Messer ALFA torches, 5 Shrinkfast Model 975

Heat Tools or 4 Model 988 Heat Tools, an NC Tool Forge with up to 12 burners,

Belchfire Mono or Model C torches and up to 8 ham glazing torches.


TB-250 and TB-500 Torch Boosters are used in many other applications where gas

flow requirements fall within 1-45 psi and up to 500 scfh gas flow. Please call

G-TEC At 1-800-451-8294 or email G-TEC to discuss your high pressure gas

requirements.

Click here for information about ordering a

TB-250 or TB-500

Torch Booster

TB-500 Torch Booster and flame cutting table

Download a TB-250/TB-500 Brochure For Cutting Brazing and Heating Applications

Download annual scheduled maintenance instructions for TB-250

Download annual scheduled maintenance instructions for TB-500

Return To The Torch Booster Page / Return To The Top Of This Page / Return To The Home Page

Refuelers let you fill

G-TEC cylinders with high

pressure natural gas

Order a G-TEC

Natural Gas

Pressure Booster

How To Install your

G-TEC System

G-TEC Systems are

Approved across the

US and Canada

Contact G-TEC

if you have questions

Torch Applications

work better with high

pressure natural gas

Natural Gas Cylinders

hold high volumes of

natural gas at only 275 psi

Refuelers let you fill

G-TEC cylinders with high

pressure natural gas

Order a G-TEC

Natural Gas

Pressure Booster

How To Install your

G-TEC System

G-TEC Systems are

Approved across the

US and Canada

Contact G-TEC

if you have questions

Torch Applications

work better with high

pressure natural gas

Natural Gas Cylinders

hold high volumes of

natural gas at only 275 psi

Choose TB-250 for gas flow up to 250 scfh / TB-500 up to 500 scfh

Older TB-250 Systems have a single gas supply inlet - click here for maintenance instructions.

Newer TB-250 Systems have two gas supply inlets - click here for maintenance instructions.

Older TB-500 Systems have a single gas supply inlet - click here for maintenance instructions.

Newer TB-500 Systems have two gas supply inlets - click here for maintenance instructions

TB 250 500 Cutting Brazing Heating Brochure.pdf TB 250 500 Cross Application Brochure.pdf

Download a TB-250/TB-500 Cross Industry Application Brochure